References
- U. Shamir, C. Howard, An analytic approach to scheduling
pipe replacement, J. AWWA, 71 (1979)
248–258.
- T.M. Walski, A. Pelliccia, Economic analysis of water main
breaks, J. AWWA, 74 (1982) 140–147.
- Y. Kleiner, B.J. Adams, J.S. Rogers, Long-term planning
methodology for water distribution system rehabilitation,
Water Resour. Res., 34 (1998) 2039–2051.
- Y. Kleiner, B.J. Adams, J.S. Rogers, Selection and scheduling of
rehabilitation alternatives for water distribution systems, Water
Resour. Res., 34 (1998) 2053–2061.
- Y. Kleiner, B. Rajani, Using limited data to assess future needs,
J. AWWA, 91 (1999) 47–62.
- J.M. Gustafson, D.V. Clancy, Using Monte Carlo Simulation to
Develop Economic Decision Criteria for the Replacement of
Cast Iron Water Mains, Proc. 1999 Annual Conference of the
AWWA, 1999.
- Y. Kleiner, Optimal Scheduling of Rehabilitation and
Inspection/Condition Assessment in Large Buried Pipes, Proc.
4th International Conference on Water Pipeline Systems –
Managing Pipeline Assets in an Evolving Market, Vol. 181, 2001.
- H.T. Luong, O. Fujiwara, Fund allocation model for pipe repair
maintenance in water distribution networks, Eur. J. Oper. Res.,
136 (2002) 403–421.
- A. Mailhot, A. Poulin, J.P. Villeneuve, Optimal replacement of
water pipes, Water Resour. Res., 39 (2003) 1136.
- T. Tanaka, L.T. Nam, K. Kaito, K. Kobayashi, Probabilistic
analysis of underground pipelines for optimal renewal time, J.
Water Supply Res. Technol. AQUA, 59 (2010) 445–451.
- K. Tamura, K. Kobayashi, The optimal repairing rules for
pavements under uncertainty, J. Jpn. Soc. Civil Eng., 18 (2001)
97–107.
- N. Lethanh, Stochastic Optimization Methods for Infrastructure
Management with Incomplete Monitoring Data, PhD Thesis,
Kyoto University, Kyoto, Japan, 2009.
- G.C. Dandy, M. Engelhardt, Optimal scheduling of water pipe
replacement using genetic algorithms, J. Water Resour. Plann.
Manage., 127 (2001) 214–223.
- H. Shin, K. Kobayashi, J. Koo, M. Do, Estimating burst
probability of water pipelines with a competing hazard model,
J. Hydroinf., 18 (2016) 126–135.
- K. Kobayashi, K. Kaito, A mixed prediction model of ground
subsidence for civil infrastructures on soft ground, J. Appl.
Math., 2012 (2012) 1–20.
- K-water, Validation Review of Optimal Renewal Period for
Multi-Regional Water Supply Pipelines, K-water, Daejeon,
Korea, 2015.
- C.F.J. Wu, M.S. Hamada, Experiments: Planning, Analysis, and
Optimization, 2nd ed., Wiley, New York, 2009.